Last edited by Takinos
Friday, July 24, 2020 | History

3 edition of Contract drawings, route no. 5, section no. 9 found in the catalog.

Contract drawings, route no. 5, section no. 9

New York (State). Public Service Commission. First District.

Contract drawings, route no. 5, section no. 9

route no. 5, Lexington Avenue route, Manhattan and Bronx : section no. 9, Lexington Avenue, 67th St. to 79th St.

by New York (State). Public Service Commission. First District.

  • 22 Want to read
  • 3 Currently reading

Published by s.n.] in [New York .
Written in English

    Subjects:
  • Local transit -- New York (State) -- New York,
  • Subways -- New York (State) -- New York

  • Classifications
    LC ClassificationsTF725.N5 A6234 1910
    The Physical Object
    Pagination[42] leaves of plates (11 folded) :
    Number of Pages42
    ID Numbers
    Open LibraryOL16966813M
    LC Control Number2008570425

    INDEX OF PAY ITEMS Pay Item Section Guardrail, W-Beam, _____ft _____in. Spacing .. Guardrail, W-Beam, _____ft _____in. Spacing,File Size: 56KB. ARTICLE Contracts with Private Architects, Engineering, Environmental, Land Surveying, and Construction Project Management Firms.

    Date of contract, Octo Contract period, 40 months, extended to Aug Summary of contractor's bid, $2,, The working drawings were completed prior to Routes Nos. 19 Section No. 1-A. — A three-track subway under Southern boulevard and Whitlock avenue, from about th street to Bancroft street. Route No. 1 Extension, Contract No. 2, (Palisades Ave to Oakland Ave) Route No. 1 Extension, Section No. 3, Contract No. 5, (Oakland Ave to Conrail Viaduct) e. Conrail Viaduct Structure No. Shop Drawings: The Phoenix Bridge Company for Route No. 1 Extension, Section No. 3, Contract No. 5, Span over Erie Cut (Easterly End.

    Hydraulic Design series No. 5 combines culvert design information previously contained in Hydraulic Engineering Circulars (HEC) No. 5, No. 10, and No. 13 with hydrologic, storage routing, and special culvert design information. The result is a comprehensive culvert design publication. Hydrologic analysis methods are described, and references cited. SECTION – AGGREGATE PAVEMENT AND BASES SECTION – AGGREGATE BASE Replacement of pavement damaged by the Contractor’s operations shall be at no additional payment. SECTION – SUBBASE paid for at the contract unit price per cubic yard, complete in Size: KB.


Share this book
You might also like
man who bucked up

man who bucked up

Universal character education

Universal character education

Develop your psychic abilities

Develop your psychic abilities

Guidelines for pre school education

Guidelines for pre school education

Marquis De Lafayette Burket.

Marquis De Lafayette Burket.

Renaissance drama in the theater

Renaissance drama in the theater

Decimal index of the art of the Low Countries

Decimal index of the art of the Low Countries

Inside the Mayo clinic

Inside the Mayo clinic

encounter of Persia with China

encounter of Persia with China

No stained-glass-window saints

No stained-glass-window saints

Great men

Great men

Contract drawings, route no. 5, section no. 9 by New York (State). Public Service Commission. First District. Download PDF EPUB FB2

Within Drawings: 1. Figures govern over scaled dimensions 2. Detail dwgs govern over general drawings Nabil dmaidi 16 3.

Change order dwgs govern over contract drawings 4. Contract dwgs govern over standard dwgs 5. Contract dwgs govern over shop drawings 6. Shop dwgs that deviate substantially from the requirement of the contract documentsFile Size: KB.

Working Drawings Manual 5 Consultant If a Consultant Design, the Consultant, after approval or certification of the working drawings for sign legends and locations, movable bridges, ITS facilities, and street/park working drawing. STANDARD. SPECIFICATIONS.

FOR. PUBLIC WORKS. CONSTRUCTION. Sponsored and Distributed by: Regional Transportation Commission of Washoe County Carson City. Churchill County. City of Reno. City of Sparks. City of Yerington.

Washoe County. File Size: 2MB. Shop Drawings—All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work.

Shop Drawings, whether approved or not, are not Drawings and are not Route no. 5 Documents. Chapter 11 Construction Drawings Topics 1 1 0# ˙˛˚˛ ˙ ˜ˆ ˛. 2 ˙ 1 1 ˛* ˆ. 2 # ˛ 1 1!3˙˛ ˙˛˚ ˛* ˆ. 2 To hear audio, click on the boxFile Size: 3MB. Project Records and Reports Page i Chapter 5 Contract Administration Section 1 Project Records and Reports Forms Used for Contract Administration A General B Construction Forms Form CEM Resident Engineer’s Report of Assignment Form CEM Relief from Maintenance Form CEM Construction Safety ReportFile Size: 1MB.

Item # Section Description 1 Form of Tender Appendix 1 Tables 9 and 10 are now included. route no. 5 Form of Agreement Schedule 2 The following drawings are added to the List of Contract Drawings: NO Description Title Rev Date 34 TE Electrical – Highway 3 View Plan – Notes – Lighting Data July 35 TE Sam Kubba Ph.D., LEED AP, in Green Construction Project Management and Cost Oversight, The Need for Specifications.

Construction specifications are usually required because drawings alone can rarely define the qualitative issues of a scheme. Well-executed specifications form the written portion of the contract documents that are used to execute the project.

File No. Old File No. Plan Title. (PDF). LL Ch 1. Standard Curbs. Standard Cold Planing And Resurfacing Cross Sections. L Ch 3. Chapter Name of the chapter No. of Pg.

periods 1. Conventional Signs, Doors, Windows, Footings 25 1 2. Building Drawing 60 12 3. Detailed Drawings of Water Supply and Drainage Connections to Building 15 28 4.

Layout of Various Water Supply and Sanitary Fittings in Bath and W.C 10 33 5. Overhead Tank 05 37 6. membrane. The sub installed this additional work, having no choice to do so. The sub’s Project Manager sent a fax asking for a Lump Sum of $15, for this extra work, without submitting any back-up.

This was rejected by the owner and architect stating that “since anchor strip is shown on contract drawings it is part of your contract”. x Basic Highway Plan Reading A Note on Safety As an employee of the Georgia Department of Transportation, it is your responsibility to direct your concern to one goal, which is to provide the traveling public with the best and safest roadway system that can be constructed.

CONTRACT PLANS, SPECIFICATIONS AND ESTIMATE 04/13/11 § and signed sheet covers all engineering content within the proposal. Working copies of these sheets are provided as cells that can be found in the cell library.

They can be downloaded. Disputes Page Chapter 5 Contract Administration Section 4 Disputes General The objective of this section is to provide guidance to the contract administrative team so that requests for information, protests, contract disputes, potential claims, and claims are addressed and resolved expeditiously and Size: KB.

This document, Special Provisions and Standard Drawings for the Installation and Modification of Traffic Signals, governs the contractual construction activities related to traffic signals in the City of Los Angeles.

Where no contract is applicable, but reference is made to “contractor”, said provisions. Other standards for compliance (Yellow Book – clause ) Training to be provided for employer’s personnel (Yellow Book – clause ) Numbers and types of copies of as-built drawings (Yellow Book – clause ) 0&M manuals (Yellow Book – clause ) Arrangements for staff and labour (clause ) Facilities for staff and labour (clause ).

Alternate No. 1 - Electrical: 1. Route select lighting conduits along interior ceiling cove surface as indicated on Electrical Drawings. Alternate No. 2 – General Construction –SECTION 09 68 13 – CARPETING: 1. Omit CARPET TILE CPT-1 2. Construct CARPET ALTERNATE 1 – TANDUS CENTIVA - POWERBOND RS, LONGITUDE OR SIMILARFile Size: 2MB.

No annual contracts may be awarded for any new construction. The contracts shall be awarded to the lowest responsible bidder and shall be based on plans and specifications for typical work.

No project shall be performed under the contract except by order of the board of supervisors, or an officer acting pursuant to Section CONTRACT INFORMATION BOOK (CIB) TABLE OF CONTENTS CONTRACT NO.

This book shall be examined to determine that each page set out in the Contract Information Table of Contents, and the Special Provisions Table of Contents is attached, legible, and current. STANDARD DRAWINGS LISTED ON STANDARD DRAWING INDEX EFFECTIVE Roadway Standard Construction Drawings.

Traffic Standard Construction Drawings detailing highway lighting, maintenance of traffic, traffic control, and intelligent transportation systems(HL, MT, TC & ITS series) are also the link provided in the previous sentence or the Traffic Standards link in the menu on the left.

a contract to which section applies, or to any other contract for the sale, or for the sale and delivery, of specific goods, where the contract is frustrated because the goods have perished. Compare: No 20 s 4(5).the limitations of this section. This agreement so to arbitrate and any other agreement or consent to arbitrate entered into in accordance herewith will be specifically enforceable under the prevailing laws of any court having jurisdiction.

No demand for arbitration of any claim, dispute or other matter that is required to be referred to EngineerFile Size: 2MB.Contractor must maintain at the Project Site at least one set of As-Built Drawings (as defined in A above), and As-built Coordination Drawings (if required by Section ) indicating the actual configuration of the Project as it is constructed.